1.1 Purpose
This procedure specifies hydrostatic testing procedure
using inline weld tester and
acceptance criteria of piping works to perform the required level
for the Project.
1.2 Scope of Application
This procedure
covers pressure testing of newly constructed plant piping and
pipelines which are designed and constructed in accordance with ASME
B31.1, ASME B31.3,
ASME B31.4, or ASME B31.8 codes as applicable. Also this procedure
covers
mandatory requirements for pressure testing existing plant piping
and pipelines for
revalidation purposes or after repairs.
The inline weld tester shall be utilized to conduct hydrostatic
testing of the flange butt weld in
accordance with SAES‐L‐ 150
paragraph 5.7.
1.3 Definitions
1.3.1 Category D Fluid Service
(As per ASME B31.3): A fluid service in which all the
following
apply:
(1) The fluid handled is nonflammable,
nontoxic, and not damaging to human tissues.
(2) The design gauge
pressure does not exceed 10.55 kg/cm2 as a gauge.
(3) The design
temperature is between – 29C and 186C.
1.3.2 Category M Fluid
Service (per ASME B31.3): A toxic fluid service in which exposure to
very small quantities of the fluid in the environment can produce
serious irreversible
harm to persons on breathing or bodily contact, even when prompt
restorative measures
are taken.
1.3.3 Normal Fluid Service: A fluid service pertaining
to most piping covered by ASME B31.3,
i.e. not subject to the rules for Category D. Category M and not
subject to severe cyclic
conditions.
1.3.4 Calculated Test Pressure: The test pressure
determine in accordance with applicable
codes and standards.
1.3.5 Minimum Test Pressure: The lowest
allowable test pressure gauge reading (the
calculated test pressure plus the additional pressure resulting from
the static head of the fluid).
1.3.6 Maximum Test Pressure: The
highest allowable test pressure gauge reading (the
pressure test rating of the “weakest” component in the test
system).
1.3.7 References
1.3.8 INTERNATIONAL CODES AND
STANDARDS
ASME B 31.3
ASME B 31.4
ASME B 31.8
1.3.9 Relevant Code and Standards
SATIP-A-004-05, Leak Testing.
G.I .2.100 Work permit system
G.I.2.102 Pressure Testing Safety
G.I 447.003 Pressure relief valves, Routine tests and
Inspections.
1.4 Units
Unless otherwise specified, metric, Celsius and kilogram units shall
be applied as the
measurement system for the drawings and documents to be
submitted.
1.4 HYDROSTATIC TEST SYSTEM (USING INLINE TESTER)
1.5 In case of flanged tie-in connections, a flange weld tester
shall be applied to conduct
hydrostatic testing of the flange weld. An inline weld tester is
applicable localized
testing of flange butt weld only.
1.6 The test shall be
hydrostatic using water, except if there is a possibility of damage
due to freezing, or if the operating fluid or piping materials would
be adversely
affected by water. Any
1.7 other suitable liquid shall be used with Company
approval.
1.7 other suitable liquid shall be used with Company
approval.
2.3.1 Testing inflammable fluids shall be avoided as far as
possible. If it is specifically
required it shall be carried out only with approval of Company.
2.3.2 If a flammable liquid is used, its flash point shall be not
less than 50 °C and
consideration shall be given to the test environment.
3 TEST
WATER CRITERIA
3.1 Criteria of hydrostatic test water shall be conformed to
SAES-A-007.
3.2 Care shall be taken to ensure the use of clean water for
hydrostatic tests. The
seawater is prohibited to being used. A suitable filter should be
provided in the filling
line to the systems in order to remove foreign mattes such as sand,
rust or other
particles in the proposed test water.
3.3 Water used for
hydrostatic testing of austenitic stainless steel piping, vessels,
and
equipment including those with austenitic stainless steel claddings,
linings or internals
(including valve trim shall conform to the requirements listed
below. These
requirements apply also to 12 chrome claddings or linings that are
welded with
austenitic stainless steel weld filler.
3.1.1 Water containing
more than the fifty- (50) ppm chlorides shall not be used.
3.1.2 Water containing more than fifty-(50) ppm but less than two
hundred (200) ppm chlorides
shall be treated with an inhibitor of 1.5% soda ash and 1.5% sodium
nitrate and re-tested to
ensure the test chloride content is 50 ppm or below
4 TEST
PRESSURE
4.1 The test pressure and test method shall be in accordance with
approved line schedule
and drawings, which are supplied by Contractor and/or Applicable
Codes as referenced
in Paragraph 1.4.1.
4.2 Provision shall be made to facilitate
conducting a strength test to the tie-in butt welds
of new piping to either new or existing piping system. The test
pressure shall be based on
the minimum required by Code of the tie-ins is to an existing
system. If a hydrostatic
testing for the tie-in butt welds is deemed impractical, a request
to utilize NDT in-lieu of
pressure testing shall be submitted for approval in accordance with
SAES-A- 004 section 6 and
section 7.
4.3 Testing of utilizing a flange tester is to ensure
the strength test of the newly weld
flange butt
4.4 weld joint. Service test of the piping system after flanged
tie-in to prove the integrity
of the piping system is applicable after the bolt torquing.
5
INLINE WELD TESTER
5.1 The Inline weld tester is used to hydrostatic test the integrity
of new or existing welds
where butt welded flange has been added to a pipeline. When a new
flange has been
welded to a pipeline, traditionally the method used to prove the
integrity of a weld
would involve flooding the pipeline in order to hydrostatic test.
Flange test overcomes
this problem as it isolates the testing area, this, reducing time
and resources required.
5.2 The flange weld tester can be used on pipes size ranging from
1/2” to 36” and pressure
rating from Class 150 to 2500. Schematic diagram of hydrostatic test
using a flange weld
tester with ancillary equipment is attached Appendix I.
Specification of flange weld
tester as per attachment.
5.3 The Inline weld tester is inserted
into the pipeline and the seal are expanded radially
against the pipe bore, either mechanically or hydraulically to seal
the weld area. The
sealed area is then pressurized through the fill port with either
liquid or gas to the
required test pressure.
5.4 Following ancillary equipment to
support hydrostatic test tools shall be utilized.
• Calibrated and certified test gauge
Pressure Gauge (2No’s)
• Calibrated pressure relief valve
• Hydrostatic test pump
• High pressure hose
• Test manifold Etc.
5.5 A Inline weld tester shall be used with
temporary gaskets for blanking flat face, raised
face and ring joint type flanges. Used gasket shall be properly
disposed and re-use of
gasket is prohibited.
6 HYDROSTATIC TESTING PROCEDURE USING A
INLINE WELD TESTER
Operating instructions which provided manufacturer is as per
attachment.
6.1 Installation
6.1.1 Verify that the barrier tape and warning signs are in
place.
6.1.2 Prepare the suitable flange weld tester with ancillary
equipment, such as calibrated and
certified test gauge, hydrostatic test pump, hose, test manifold and
etc. All ports
required to operate tool are located on the end of the tool body.
The ports are stamped,
(H) Hydraulic Port, (PM) Port Monitor, (F) Fill Port, and (V) Vent
Port.
6.1.3 Verify that the test manifold is fitted with a
pressure relief valve which calibrated to
specified pressure.
6.1.4 Check and verify the complete removal of welding slugs.
6.1.5 Inspect again the cleanness of existing pipe inside and butt
welded flange.
6.1.6 Locate flange weld tester to newly butt-welded flange. In case
of large size flange weld
tester, suitable rated lifting and rigging equipment operated by
qualified personnel is
required.
6.1.7 Insert and connect flange weld tester with
temporary gasket.
6.1.8 Conduct bolt tightening as per required bolt tension.
6.1.9 Activate the seal by either mechanically (by rotating shaft)
or hydraulically (using
hydraulic activation pump at set pressure). The seal is expanded
radially against the
pipe bore, either mechanically or hydraulically to seal off the weld
area.
6.1.10 Verify that the port monitor hose is routed to a safe monitor
area and that the open end
of the hose is sub
6.1.11 merged in a bucket of clean water.
6.1.12 Connect a suitably rated hose from the test manifold to the
fill port of the flange weld
tester.
6.1.13 Connect a suitably rated hose from the test manifold to the
hydrostatic test pump.
6.1.14 Fit the test gauge to the test manifold.
6.2 Hydrostatic test
6.2.1 Verify that the test manifold vent valve is open position.
6.2.2 Operate the hydrostatic test pump until test medium flows from
the test manifold vent
valve.
6.2.3 Close the test manifold vent valve.
6.2.4 Verify that the flange weld tester vent port valve is open
position.
6.2.5 Operate the hydrostatic test pump until test medium flows from
the flange weld tester
to vent valve.
6.2.6 Verify that all the air is expelled from the
flange weld tester void.
6.2.7 Close the flange weld tester vent port valve.
6.2.8 Operate the hydrostatic test pump until test pressure starts
to increase.
6.2.9 Increase the pressure up to the test pressure which specified
in the test package.
6.2.10 Pressure rise is staged with 10 minute holding time
(equalization time) at 50%, 70%, and
90% of the test pressure.
6.2.11 On initial pressurization, pressure holds after equalization
at 50% test pressure. Gauges
that hold pressure at 50% of the test pressure, and visually check
any leaks. Contact
COMPANY after lines shows a successful result at 50% initial
pressurization stage for
efficiency.
6.2.12 Upon pressure reach the test pressure, allow
the test pressure to stabilize. Care should
be taken not to exceed 5% of the stated test pressure. The relief
valve shall be
calibrated accordingly.
6.2.13 Hydrostatic test pressure shall be maintained for a
sufficient time to visually
determine if there are any leaks.
6.2.14 Holding period of the test pressure shall be 30 minutes
minimum and shall be extended
if deemed by the COMPANY inspector.
6.2.15 Record the test result on pressure test report.
(SATR-A-2001)
6.3 Post‐Hydrostatic test
6.3.1 Upon completion, gently bleed down the test pressure.
6.3.2 Verify that the test pressure is at zero.
6.3.3 Open the flange weld tester vent port valve.
6.3.4 Verify that the atmosphere contained by the flange weld tester
is at ambient pressure.
6.3.5 Disconnect the hoses and allow the
test medium to drain as per SAEP-327.
6.3.6 De-activate the seal by either mechanically (by rotating
shaft) or hydraulically (by
bleed down the flange weld tester hydraulic set pressure).
6.3.7 Allow 5 minutes for the tool seals to fully relax.
6.3.8 Loosen the bolts on the flange weld tester.
6.3.9 Remove the flange weld tester from newly butt welded flange.
In case of large size
inline weld tester, suitable rated lifting and rigging equipment
operated by qualified
personnel is required.
6.3.10 Clean up the Inline weld tester with ancillary equipment
.
6.3.11 Tide the work site and remove barrier tape and warning
signs.
6.3.12 Conduct reinstatement works as per isometric drawing.
6.3.13 Conduct bolt touqueing and then service test shall be
executed during the start-up
in order to prove the integrity of the piping system.
7 FINAL
INSPECTION
When the Subcontractor has completed hydrostatic test, the
Contractor shall inspect the
system for reinstatement and shall notify the Subcontractor of any
deficiencies or outstanding
work which shall be completed prior to acceptance of the system. If
there are no remaining
works, the system shall be accepted by Contractor and Company.
8 TEST RECORDS
8.1 Test result shall be recorded in pressure test report as per
SAIC-A-2015, visual inspection
at test pressure for Hydro Testing of Piping System
8.2 Records shall be made of each test package. These records, when
completed, shall be
submitted as part of the test and inspection certificates, which are
required for precommissioning.
Records shall include;
(1) Date of test
(2) Identification of piping system
(3) Test medium
(4) Test pressure and maintaining time with pressure gauge range and
calibration
certificate for 2 gauges.
(5) Test manifold with calibration certificate
(6) Flange weld tester calibration certificate
(7) Relief valve (1 No;s) Calibration certificate
(8) Test pump with calibration
(9) Minimum ambient temperature
(10) Test medium temperature
(11) Pressurizing procedure and apparatus for high-pressure piping
(if necessary)
(12) Approval signature of witnesses (Company, Contractor and
Subcontractor)
8.3 The test pressure recorders for piping which require that
pressure be held for a specified
period of time shall include any corrections of test pressure due to
temperature
variations between the start and finish of the test.
8.4 All test records and authorized Contractor certification shall
be retained in the test
package records for turnover to the Company. Test database shall be
established to
monitor status and progress.
9 TEST COMPLETION
9.1 The hydrostatic test shall be considered complete when;
(1) All defective welds, defective materials, flange leaks, valve
gland leaks, or other such
defects have been corrected to the satisfaction of the Company.
(2) All documentation and test package information is completed and
accepted by the
Contractor and by Company.
9.2 In the event that repairs or additions are made after the
pressure test, the piping shall
be retested at the pressures originally specified for the test.
APPENDIX. I SCHEMATIC DIAGRAM OF HYDROSTATIC TESTING USING INLINE
WELD TEST WITH ANCILLARY EQUIPMENT
(1) Inline weld tester (Calibrated)
(2) Calibrated and certified test gauges (2 No’s) PG Validity -1
Month
(3) Calibrated and certified PRESSURE RELIEF VALVE
(4) Hydrostatic test pump with calibration
(5) High pressure hose
(6) Test manifold with calibration certificate
(7) Relief valve with calibration (Validity of calibration 2 Weeks)
Salaba Al-Omran Torque and Tensioning has been providing torque and
tension services. We renamed our services division, ‘We have
expanded our service areas while offering our mechanical services
for all industries 24 / 7 everyday of the year. No matter how big or
small the job, Salaba Al-Omran provides complete turn-key service
and
technical support.
Whether a planned or unplanned outage, you
can feel confident that you have the very best on-site to ensure
leak-free start-up of such critical assemblies as pipe flanges,
turbines, reactors, vessel man-ways, compressors, and heat
exchangers.
Salaba Al-Omran Bolt Torquing services provide a
simple and safe method for ensuring controlled tightening and
loosening of bolts. A wide range of light, compact, safe and
easy-to-use hydraulic, pneumatic, electric and battery powered
torque tools are available.
Each flange will be
torqued/tensioned to the customer specifications using standard
industry procedures. All information, including the customer
supplied Flange ID number, will be marked on a Flange Identification
Tag and recorded on a Flange Inspection & Tightening
Report.
All completed Flange Inspection & Tightening Reports
are provided to the customer and are brought back to the office and
checked by management/office personnel before being scanned into our
system. The files are saved onto a secure system and named with the
flange identification tag serial number.
Specialized in various class of Equipment Rental
Services.
Salaba Al-Omran provides a unique
rental proposition – an alternative to “buy”. We provide
comprehensive range of equipment on rental basis as per clients’
requirement
Salaba Al-Omran ensures equipment from reliable and
established majors in the Kingdom to our clients.
Salaba
Al-Omran provides construction equipment on rent at cost
effective prices for a flexible length of time. This equipment is
widely used for different kinds of construction and
repair.
Salaba Al-Omran has professionals with
outstanding service and commitment for catering to our
clients.
Salaba Al-Omran supports your need for technical and administrative manpower resources by providing experienced blue collar and white collar professionals capable of project lifecycle support, be it design, engineering or supervision. Salaba Al-Omran offers you years of expertise gained by providing professionals to leading companies. Our experience includes supporting Industrial giants such as SABIC, SAUDI ARAMCO and many other leading firms. Salaba Al-Omran provides professionals on temporary, contract or permanent basis. Salaba Al-Omran has a regularly updated large national database of professionals that enables supply of required manpower in short notice
Building and Civil engineering work are living workplaces where the
prerequisites constantly change. Salaba Al-Omran
strives to provide good planning and design in providing Civil works
and Building works for its clients.
Salaba Al-Omran engineering, procurement and
construction expertise includes traditional disciplines,
architectural, civil, electrical, mechanical and structural
engineering, as well as process and mechanical design.
Salaba Al-Omranexperience in civil works include
concrete foundations for plant heavy equipment and Petroleum
Construction Civil works, Pipe Rack fabrication and
erection.
Salaba Al-Omran experience in Building works include
residential apartments and villas, commercial buildings and malls,
steel structural buildings, plant and refinery building works,
scaffolding & erection and road construction.
Salaba Al-Omran has rich experience and expertise in
planning, design and in execution of civil works and building
works.
Salaba Al-Omran provides General Plant and Rotating
and Static Equipment maintenance services.
Salaba Al-Omran team of professionals have extensive
experience serving leading firms achieve a cost effective and time
efficient shutdown/turnaround using our process and Maintenance
Shutdown Planning.
Periodic maintenance and overhauling play a vital role in effective
functioning of the Plant. Salaba Al-Omran understands
the importance of it and ensures customers get professional services
at the right time and at the right place.
We ensure the equipment operate under safe conditions while ensuring
optimum uptime.
Our services include Plant modification and revamp works, Columns,
Vessels and Tank repairs, Retubing of Heat Exchangers and
Condensers, Pipe Cutting and Line Boring, Stud Drilling and
Mechanical Support works.
Salaba Al-Omran has at its core, a team of efficient,
dedicated and skilled employees who straddle most industrial sectors
and provide a versatile project management capability.
It has always been our policy to invest heavily in our human
resources through appraisal, coaching and training the employees at
all levels.
Our international recruitment agents in various countries can
mobilize large numbers of highly skilled Tradesmen and Engineers at
an amazingly short duration.
We are focused to consistently
improve the high quality and standards of personnel, for which
Salaba Al-Omran
has been always recognized.
We are keen to target new contracts that will maintain our workload
for engineering and construction. The core area of our business has
been in the Petrochemical sector and we can execute an EPC project
in its entirety.
In addition to the total quality services that we can provide in
construction and engineering sectors, we can execute Lump Sum
Turnkey Projects as well.
Salaba Al-Omran policy is to train the indigenous
labor force and retain this staff within the subsidiary operation,
providing specialists in the core areas of engineering and
construction.
There are times, when you have to work with the best overseas
manpower services. You cannot deal with the right expert, over here,
as there are loads of options available. However, with our team, it
is going to be quite interesting for you to get along with the best
approaches of all time. Join hand with us, and we will let you enjoy
the magical experience of overseas manpower recruitment agency. And
our team is always here to offer quality approaches, all for your
help now. We are here to offer you with the best services of all
time.
We guarantee more than just promptness Through our regularly updated
and maintained database, we guarantee ready availability of ideal
professionals; for every position of our specialty sectors.
Everything from the planning to the interview, leading to selection
and hiring, right up to their work-site arrival and performance, is
our responsibility. We are hence renowned as the agency capable of
providing a complete recruitment solution for every human resource
need.
We understand how crucial it is to have prompt provision of
effective, efficient and specialized personnel for all sectors. We
realize that when it comes to sensitive and dynamic businesses,
especially the ones that have been heavily invested into, one cannot
take chances.
Considering factors such as these, Salaba Al-Omran has
yet again set an example for the recruitment industry. It has come
to focus its resources and proficiency towards the following listed
eight sectors, which require the best-in-class manpower solutions;
in a manner most professional, and timely.
★ Construction
★ Manufacturing
★ Oil and Gas
★ Engineering
★ Hospitality
★ Energy and Resources
★ IT and Telecom
★ Support Services
★ Mining
Salaba Al-Omran is a premier trading company focused on
providing efficient solutions to general contracting business.
Structural steel fabrication and Erection including
pre-engineered and hot rolled steel framed buildin
Pipe racks and Equipment structure.
Our expertise in fabrication and Erection in variety
of erection projects provide a significant
complimentary contribution to our construction
activities.