SERVICES



  • Hydro Testing

    1.1 Purpose
    This procedure specifies hydrostatic testing procedure using inline weld tester and acceptance criteria of piping works to perform the required level for the Project.
    1.2 Scope of Application
    This procedure covers pressure testing of newly constructed plant piping and pipelines which are designed and constructed in accordance with ASME B31.1, ASME B31.3, ASME B31.4, or ASME B31.8 codes as applicable. Also this procedure covers mandatory requirements for pressure testing existing plant piping and pipelines for revalidation purposes or after repairs. The inline weld tester shall be utilized to conduct hydrostatic testing of the flange butt weld in
    accordance with SAES‐L‐ 150 paragraph 5.7.
    1.3 Definitions
    1.3.1 Category D Fluid Service (As per ASME B31.3): A fluid service in which all the following
    apply:
    (1) The fluid handled is nonflammable, nontoxic, and not damaging to human tissues.
    (2) The design gauge pressure does not exceed 10.55 kg/cm2 as a gauge.
    (3) The design temperature is between – 29C and 186C.
    1.3.2 Category M Fluid Service (per ASME B31.3): A toxic fluid service in which exposure to very small quantities of the fluid in the environment can produce serious irreversible harm to persons on breathing or bodily contact, even when prompt restorative measures are taken.
    1.3.3 Normal Fluid Service: A fluid service pertaining to most piping covered by ASME B31.3, i.e. not subject to the rules for Category D. Category M and not subject to severe cyclic conditions.
    1.3.4 Calculated Test Pressure: The test pressure determine in accordance with applicable codes and standards.
    1.3.5 Minimum Test Pressure: The lowest allowable test pressure gauge reading (the calculated test pressure plus the additional pressure resulting from the static head of the fluid).
    1.3.6 Maximum Test Pressure: The highest allowable test pressure gauge reading (the pressure test rating of the “weakest” component in the test system).
    1.3.7 References
    1.3.8 INTERNATIONAL CODES AND STANDARDS
    ASME B 31.3
    ASME B 31.4
    ASME B 31.8
    1.3.9 Relevant Code and Standards
    SATIP-A-004-05, Leak Testing.
    G.I .2.100 Work permit system
    G.I.2.102 Pressure Testing Safety
    G.I 447.003 Pressure relief valves, Routine tests and Inspections.
    1.4 Units
    Unless otherwise specified, metric, Celsius and kilogram units shall be applied as the measurement system for the drawings and documents to be submitted.
    1.4 HYDROSTATIC TEST SYSTEM (USING INLINE TESTER) 1.5 In case of flanged tie-in connections, a flange weld tester shall be applied to conduct
    hydrostatic testing of the flange weld. An inline weld tester is applicable localized testing of flange butt weld only.
    1.6 The test shall be hydrostatic using water, except if there is a possibility of damage due to freezing, or if the operating fluid or piping materials would be adversely affected by water. Any
    1.7 other suitable liquid shall be used with Company approval.
    1.7 other suitable liquid shall be used with Company approval.
    2.3.1 Testing inflammable fluids shall be avoided as far as possible. If it is specifically required it shall be carried out only with approval of Company.
    2.3.2 If a flammable liquid is used, its flash point shall be not less than 50 °C and consideration shall be given to the test environment.
    3 TEST WATER CRITERIA
    3.1 Criteria of hydrostatic test water shall be conformed to SAES-A-007.
    3.2 Care shall be taken to ensure the use of clean water for hydrostatic tests. The seawater is prohibited to being used. A suitable filter should be provided in the filling line to the systems in order to remove foreign mattes such as sand, rust or other particles in the proposed test water.
    3.3 Water used for hydrostatic testing of austenitic stainless steel piping, vessels, and equipment including those with austenitic stainless steel claddings, linings or internals (including valve trim shall conform to the requirements listed below. These requirements apply also to 12 chrome claddings or linings that are welded with austenitic stainless steel weld filler.
    3.1.1 Water containing more than the fifty- (50) ppm chlorides shall not be used.
    3.1.2 Water containing more than fifty-(50) ppm but less than two hundred (200) ppm chlorides shall be treated with an inhibitor of 1.5% soda ash and 1.5% sodium nitrate and re-tested to ensure the test chloride content is 50 ppm or below
    4 TEST PRESSURE
    4.1 The test pressure and test method shall be in accordance with approved line schedule and drawings, which are supplied by Contractor and/or Applicable Codes as referenced in Paragraph 1.4.1.
    4.2 Provision shall be made to facilitate conducting a strength test to the tie-in butt welds of new piping to either new or existing piping system. The test pressure shall be based on the minimum required by Code of the tie-ins is to an existing system. If a hydrostatic testing for the tie-in butt welds is deemed impractical, a request to utilize NDT in-lieu of pressure testing shall be submitted for approval in accordance with SAES-A- 004 section 6 and section 7.
    4.3 Testing of utilizing a flange tester is to ensure the strength test of the newly weld flange butt
    4.4 weld joint. Service test of the piping system after flanged tie-in to prove the integrity of the piping system is applicable after the bolt torquing.
    5 INLINE WELD TESTER
    5.1 The Inline weld tester is used to hydrostatic test the integrity of new or existing welds where butt welded flange has been added to a pipeline. When a new flange has been welded to a pipeline, traditionally the method used to prove the integrity of a weld would involve flooding the pipeline in order to hydrostatic test. Flange test overcomes this problem as it isolates the testing area, this, reducing time and resources required.
    5.2 The flange weld tester can be used on pipes size ranging from 1/2” to 36” and pressure rating from Class 150 to 2500. Schematic diagram of hydrostatic test using a flange weld tester with ancillary equipment is attached Appendix I. Specification of flange weld tester as per attachment.
    5.3 The Inline weld tester is inserted into the pipeline and the seal are expanded radially against the pipe bore, either mechanically or hydraulically to seal the weld area. The sealed area is then pressurized through the fill port with either liquid or gas to the required test pressure.
    5.4 Following ancillary equipment to support hydrostatic test tools shall be utilized.
    • Calibrated and certified test gauge
     Pressure Gauge (2No’s)
    • Calibrated pressure relief valve
    • Hydrostatic test pump
    • High pressure hose
    • Test manifold Etc.
    5.5 A Inline weld tester shall be used with temporary gaskets for blanking flat face, raised face and ring joint type flanges. Used gasket shall be properly disposed and re-use of gasket is prohibited.
    6 HYDROSTATIC TESTING PROCEDURE USING A INLINE WELD TESTER Operating instructions which provided manufacturer is as per attachment.
    6.1 Installation
    6.1.1 Verify that the barrier tape and warning signs are in place.
    6.1.2 Prepare the suitable flange weld tester with ancillary equipment, such as calibrated and certified test gauge, hydrostatic test pump, hose, test manifold and etc. All ports required to operate tool are located on the end of the tool body. The ports are stamped, (H) Hydraulic Port, (PM) Port Monitor, (F) Fill Port, and (V) Vent Port.
    6.1.3 Verify that the test manifold is fitted with a pressure relief valve which calibrated to specified pressure.
    6.1.4 Check and verify the complete removal of welding slugs.
    6.1.5 Inspect again the cleanness of existing pipe inside and butt welded flange.
    6.1.6 Locate flange weld tester to newly butt-welded flange. In case of large size flange weld tester, suitable rated lifting and rigging equipment operated by qualified personnel is required.
    6.1.7 Insert and connect flange weld tester with temporary gasket.
    6.1.8 Conduct bolt tightening as per required bolt tension.
    6.1.9 Activate the seal by either mechanically (by rotating shaft) or hydraulically (using hydraulic activation pump at set pressure). The seal is expanded radially against the pipe bore, either mechanically or hydraulically to seal off the weld area.
    6.1.10 Verify that the port monitor hose is routed to a safe monitor area and that the open end of the hose is sub
    6.1.11 merged in a bucket of clean water.
    6.1.12 Connect a suitably rated hose from the test manifold to the fill port of the flange weld tester.
    6.1.13 Connect a suitably rated hose from the test manifold to the hydrostatic test pump.
    6.1.14 Fit the test gauge to the test manifold.
    6.2 Hydrostatic test
    6.2.1 Verify that the test manifold vent valve is open position.
    6.2.2 Operate the hydrostatic test pump until test medium flows from the test manifold vent valve.
    6.2.3 Close the test manifold vent valve.
    6.2.4 Verify that the flange weld tester vent port valve is open position.
    6.2.5 Operate the hydrostatic test pump until test medium flows from the flange weld tester to vent valve.
    6.2.6 Verify that all the air is expelled from the flange weld tester void.
    6.2.7 Close the flange weld tester vent port valve.
    6.2.8 Operate the hydrostatic test pump until test pressure starts to increase.
    6.2.9 Increase the pressure up to the test pressure which specified in the test package.
    6.2.10 Pressure rise is staged with 10 minute holding time (equalization time) at 50%, 70%, and 90% of the test pressure.
    6.2.11 On initial pressurization, pressure holds after equalization at 50% test pressure. Gauges that hold pressure at 50% of the test pressure, and visually check any leaks. Contact COMPANY after lines shows a successful result at 50% initial pressurization stage for efficiency.
    6.2.12 Upon pressure reach the test pressure, allow the test pressure to stabilize. Care should be taken not to exceed 5% of the stated test pressure. The relief valve shall be calibrated accordingly.
    6.2.13 Hydrostatic test pressure shall be maintained for a sufficient time to visually determine if there are any leaks.
    6.2.14 Holding period of the test pressure shall be 30 minutes minimum and shall be extended if deemed by the COMPANY inspector.
    6.2.15 Record the test result on pressure test report. (SATR-A-2001)
    6.3 Post‐Hydrostatic test
    6.3.1 Upon completion, gently bleed down the test pressure.
    6.3.2 Verify that the test pressure is at zero.
    6.3.3 Open the flange weld tester vent port valve.
    6.3.4 Verify that the atmosphere contained by the flange weld tester is at ambient pressure.
    6.3.5 Disconnect the hoses and allow the test medium to drain as per SAEP-327.
    6.3.6 De-activate the seal by either mechanically (by rotating shaft) or hydraulically (by bleed down the flange weld tester hydraulic set pressure).
    6.3.7 Allow 5 minutes for the tool seals to fully relax.
    6.3.8 Loosen the bolts on the flange weld tester.
    6.3.9 Remove the flange weld tester from newly butt welded flange. In case of large size inline weld tester, suitable rated lifting and rigging equipment operated by qualified personnel is required.
    6.3.10 Clean up the Inline weld tester with ancillary equipment .
    6.3.11 Tide the work site and remove barrier tape and warning signs.
    6.3.12 Conduct reinstatement works as per isometric drawing.
    6.3.13 Conduct bolt touqueing and then service test shall be executed during the start-up in order to prove the integrity of the piping system.
    7 FINAL INSPECTION When the Subcontractor has completed hydrostatic test, the Contractor shall inspect the system for reinstatement and shall notify the Subcontractor of any deficiencies or outstanding work which shall be completed prior to acceptance of the system. If there are no remaining works, the system shall be accepted by Contractor and Company.
    8 TEST RECORDS
    8.1 Test result shall be recorded in pressure test report as per SAIC-A-2015, visual inspection at test pressure for Hydro Testing of Piping System
    8.2 Records shall be made of each test package. These records, when completed, shall be submitted as part of the test and inspection certificates, which are required for precommissioning. Records shall include;
    (1) Date of test
    (2) Identification of piping system
    (3) Test medium
    (4) Test pressure and maintaining time with pressure gauge range and calibration certificate for 2 gauges.
    (5) Test manifold with calibration certificate
    (6) Flange weld tester calibration certificate
    (7) Relief valve (1 No;s) Calibration certificate
    (8) Test pump with calibration
    (9) Minimum ambient temperature
    (10) Test medium temperature
    (11) Pressurizing procedure and apparatus for high-pressure piping (if necessary)
    (12) Approval signature of witnesses (Company, Contractor and Subcontractor)
    8.3 The test pressure recorders for piping which require that pressure be held for a specified period of time shall include any corrections of test pressure due to temperature variations between the start and finish of the test.
    8.4 All test records and authorized Contractor certification shall be retained in the test package records for turnover to the Company. Test database shall be established to monitor status and progress.
    9 TEST COMPLETION
    9.1 The hydrostatic test shall be considered complete when; (1) All defective welds, defective materials, flange leaks, valve gland leaks, or other such defects have been corrected to the satisfaction of the Company. (2) All documentation and test package information is completed and accepted by the Contractor and by Company.
    9.2 In the event that repairs or additions are made after the pressure test, the piping shall be retested at the pressures originally specified for the test. APPENDIX. I SCHEMATIC DIAGRAM OF HYDROSTATIC TESTING USING INLINE WELD TEST WITH ANCILLARY EQUIPMENT
    (1) Inline weld tester (Calibrated)
    (2) Calibrated and certified test gauges (2 No’s) PG Validity -1 Month
    (3) Calibrated and certified PRESSURE RELIEF VALVE
    (4) Hydrostatic test pump with calibration
    (5) High pressure hose
    (6) Test manifold with calibration certificate
    (7) Relief valve with calibration (Validity of calibration 2 Weeks)

  • Bolt Torquing

    Salaba Al-Omran Torque and Tensioning has been providing torque and tension services. We renamed our services division, ‘We have expanded our service areas while offering our mechanical services for all industries 24 / 7 everyday of the year. No matter how big or small the job, Salaba Al-Omran provides complete turn-key service and technical support.

    Whether a planned or unplanned outage, you can feel confident that you have the very best on-site to ensure leak-free start-up of such critical assemblies as pipe flanges, turbines, reactors, vessel man-ways, compressors, and heat exchangers.

    Salaba Al-Omran Bolt Torquing services provide a simple and safe method for ensuring controlled tightening and loosening of bolts. A wide range of light, compact, safe and easy-to-use hydraulic, pneumatic, electric and battery powered torque tools are available.

    Each flange will be torqued/tensioned to the customer specifications using standard industry procedures. All information, including the customer supplied Flange ID number, will be marked on a Flange Identification Tag and recorded on a Flange Inspection & Tightening Report.

    All completed Flange Inspection & Tightening Reports are provided to the customer and are brought back to the office and checked by management/office personnel before being scanned into our system. The files are saved onto a secure system and named with the flange identification tag serial number.

  • Equipment Rental

    Specialized in various class of Equipment Rental Services.

    Salaba Al-Omran provides a unique rental proposition – an alternative to “buy”. We provide comprehensive range of equipment on rental basis as per clients’ requirement

    Salaba Al-Omran ensures equipment from reliable and established majors in the Kingdom to our clients.

    Salaba Al-Omran provides construction equipment on rent at cost effective prices for a flexible length of time. This equipment is widely used for different kinds of construction and repair.

    Salaba Al-Omran has professionals with outstanding service and commitment for catering to our clients.

    Our Equipment Rental section includes-



    ★ Mobile Cranes

    ★ Crawler Cranes

    ★ Forklift

    ★ Man Lift

    ★ Excavators

    ★ Backhoe Loaders

    ★ Bulldozers

    ★ Rollers

    ★ Mini Loaders

    ★ Generators

  • Industrial Supportental

    Salaba Al-Omran supports your need for technical and administrative manpower resources by providing experienced blue collar and white collar professionals capable of project lifecycle support, be it design, engineering or supervision. Salaba Al-Omran offers you years of expertise gained by providing professionals to leading companies. Our experience includes supporting Industrial giants such as SABIC, SAUDI ARAMCO and many other leading firms. Salaba Al-Omran provides professionals on temporary, contract or permanent basis. Salaba Al-Omran has a regularly updated large national database of professionals that enables supply of required manpower in short notice

  • Industrial Construction

    Building and Civil engineering work are living workplaces where the prerequisites constantly change. Salaba Al-Omran strives to provide good planning and design in providing Civil works and Building works for its clients.

    Salaba Al-Omran engineering, procurement and construction expertise includes traditional disciplines, architectural, civil, electrical, mechanical and structural engineering, as well as process and mechanical design.

    Salaba Al-Omranexperience in civil works include concrete foundations for plant heavy equipment and Petroleum Construction Civil works, Pipe Rack fabrication and erection.

    Salaba Al-Omran experience in Building works include residential apartments and villas, commercial buildings and malls, steel structural buildings, plant and refinery building works, scaffolding & erection and road construction.

    Salaba Al-Omran has rich experience and expertise in planning, design and in execution of civil works and building works.

  • Operation and Maintenance

    Salaba Al-Omran provides General Plant and Rotating and Static Equipment maintenance services.
    Salaba Al-Omran team of professionals have extensive experience serving leading firms achieve a cost effective and time efficient shutdown/turnaround using our process and Maintenance Shutdown Planning.
    Periodic maintenance and overhauling play a vital role in effective functioning of the Plant. Salaba Al-Omran understands the importance of it and ensures customers get professional services at the right time and at the right place.
    We ensure the equipment operate under safe conditions while ensuring optimum uptime.
    Our services include Plant modification and revamp works, Columns, Vessels and Tank repairs, Retubing of Heat Exchangers and Condensers, Pipe Cutting and Line Boring, Stud Drilling and Mechanical Support works.

    Salaba Al-Omran Services include:-



    ★ Electrical.
    ★ Mechanical.
    ★ Fire System.
    ★ Scaffolding works.

    Electrical and Mechanical Works

    Electrical works

    Salaba Al-Omran enjoys a sterling reputation in our business community as a skilled and trusted source for a wide range of services including electrical, mechanical, fire system and scaffolding works. Many have trusted us to build electrical and lighting systems that are efficient to run and maintain. Others ask us to retrofit or upgrade what’s already installed to improve performance.

    Scaffolding Works



    Salaba Al-Omran is one of the leading scaffolding contractors. We are well experienced in scaffolding business. We offer to all our clients’ competitive rates together with the highest standard of work.

    Our work varies enormously from simple scaffoldings, for a painting a private customer house, up to the largest commercial and industrial scaffold projects. Whenever you need scaffolding hire for decoration, re-decoration, roofing, temporary roofing, industrial tower, Salaba Al-Omran provides it for you at the right time.

    Mechanical—Rotating Equipment

    Overhauling and Inspection of the following types of rotating equipment:

    ★ Turbines
    ★ Compressors
    ★ Pumping & Agitators
    ★ Gear Boxes

  • Support Services:

    Salaba Al-Omran has at its core, a team of efficient, dedicated and skilled employees who straddle most industrial sectors and provide a versatile project management capability.
    It has always been our policy to invest heavily in our human resources through appraisal, coaching and training the employees at all levels. Our international recruitment agents in various countries can mobilize large numbers of highly skilled Tradesmen and Engineers at an amazingly short duration.
    We are focused to consistently improve the high quality and standards of personnel, for which Salaba Al-Omran has been always recognized.
    We are keen to target new contracts that will maintain our workload for engineering and construction. The core area of our business has been in the Petrochemical sector and we can execute an EPC project in its entirety.
    In addition to the total quality services that we can provide in construction and engineering sectors, we can execute Lump Sum Turnkey Projects as well.

    Salaba Al-Omran policy is to train the indigenous labor force and retain this staff within the subsidiary operation, providing specialists in the core areas of engineering and construction.

  • Manpower Supply

    There are times, when you have to work with the best overseas manpower services. You cannot deal with the right expert, over here, as there are loads of options available. However, with our team, it is going to be quite interesting for you to get along with the best approaches of all time. Join hand with us, and we will let you enjoy the magical experience of overseas manpower recruitment agency. And our team is always here to offer quality approaches, all for your help now. We are here to offer you with the best services of all time.

    We guarantee more than just promptness Through our regularly updated and maintained database, we guarantee ready availability of ideal professionals; for every position of our specialty sectors. Everything from the planning to the interview, leading to selection and hiring, right up to their work-site arrival and performance, is our responsibility. We are hence renowned as the agency capable of providing a complete recruitment solution for every human resource need.

    We understand how crucial it is to have prompt provision of effective, efficient and specialized personnel for all sectors. We realize that when it comes to sensitive and dynamic businesses, especially the ones that have been heavily invested into, one cannot take chances.

    Considering factors such as these, Salaba Al-Omran has yet again set an example for the recruitment industry. It has come to focus its resources and proficiency towards the following listed eight sectors, which require the best-in-class manpower solutions; in a manner most professional, and timely.

    ★ Construction
    ★ Manufacturing
    ★ Oil and Gas
    ★ Engineering
    ★ Hospitality
    ★ Energy and Resources
    ★ IT and Telecom
    ★ Support Services
    ★ Mining

  • Trading

    Salaba Al-Omran is a premier trading company focused on providing efficient solutions to general contracting business.

    Our Products-



    Safety PPE and general Materials.
    Industrial hand Tools & Power tools.
    Welding & Fabrication Tools & Accessories.
    Lifting equipment and Marine tackles.
    General Building Materials & Masonry Tools.

  • Fabrication & Erections



    Structural steel fabrication and Erection including pre-engineered and hot rolled steel framed buildin

    Pipe racks and Equipment structure.

    Our expertise in fabrication and Erection in variety of erection projects provide a significant complimentary contribution to our construction activities.